Modular Solutions

Modular Medical Buildings

Permanent and semi-permanent modular imaging facilities — engineered, built, and installed by USA Mobile Medical. Faster than traditional construction, with the same clinical-grade quality as our mobile fleet.

4–6 Month
Typical Build Timeline
CT, MRI, PET/CT
All Major Modalities
Scalable
Single Suite to Multi-Room
Turnkey
Design Through Installation
Overview

What Are Modular Medical Buildings?

Container-based structures purpose-built for medical imaging, positioned on-site as permanent or semi-permanent facilities. Modular buildings deliver the clinical environment you need in a fraction of the time — and at a lower cost — than traditional brick-and-mortar construction.

No foundation required in most cases. Can be standalone or integrated with existing hospital infrastructure. Your imaging program up and running faster, without the delays of conventional building projects.

Faster to Deploy

Months, not years. Parallel design and manufacturing means your facility is built while infrastructure planning happens on-site.

Lower Cost

Significant savings vs. traditional construction. No extended timelines, minimal site disruption, fewer contingencies.

Fully Customizable

Clinical layouts to your exact specifications. Choose your equipment, footprint, finishes, and features — all within the modular structure.

Relocatable

If your program needs change, the facility can be moved. Protect your investment and adapt to future growth.

Configurations

Available Configurations

Modular CT Suite

  • Radiation shielding engineered for CT & control
  • Chiller system & precision HVAC
  • 480V 3-phase electrical infrastructure
  • OEM equipment installation & calibration
  • Patient area & technologist workspace
  • ADA-compliant access & pathways

Modular MRI Suite

  • Faraday cage & RF shielding
  • Magnetic exclusion zone planning
  • Dedicated chiller system
  • 480V 3-phase power infrastructure
  • OEM magnet installation & cryogenic setup
  • Quench vent & helium lines

Modular PET/CT Suite

  • Radiation shielding for PET & CT
  • Radioisotope handling areas
  • Dedicated power & HVAC systems
  • Hot lab configuration available
  • OEM equipment installation & calibration
  • Dose calibrator & storage setup

Modular Multi-Room Facility

  • Dual or triple imaging suites in one building
  • Shared infrastructure & control systems
  • Centralized HVAC & power distribution
  • Reception & patient flow areas
  • Integrated OEM equipment deployment
  • Scalable to your program size
Modular CT imaging suite floor plan
What You Get

What's Included

  • Custom floor plan & clinical layout design
  • RF shielding (MRI) / radiation shielding (CT, PET/CT)
  • Chiller system & precision HVAC
  • 480V 3-phase electrical infrastructure
  • OEM equipment installation & calibration
  • Patient areas, tech workstations & changing rooms
  • ADA-compliant access & pathways
  • Fire-rated construction (up to 60-minute rating)
  • Exterior finish & site integration
  • Full QC testing before handoff
Sample Layouts

Floor Plans & Layouts

Floor plans and layouts shown are visual examples only. All projects include fully customized layouts designed around your facility's specific clinical workflow, equipment, and site requirements.

Our Process

Build Process Timeline

1

Consultation & Needs Assessment

Define your clinical and operational requirements. Equipment selection, imaging mix, spatial needs, timeline, and budget parameters.

2

Design & Engineering

Detailed clinical floor plans, structural drawings, electrical & HVAC schematics, shielding specifications, and equipment integration plans.

3

Manufacturing & Systems Integration

Full construction of the modular units in our facility. HVAC, electrical, plumbing, shielding, and interior finish work completed on schedule.

4

Delivery & Installation

Modular units delivered to your site and positioned. Site-specific connections, external systems integration, and final utility hookups.

5

Commissioning & Handoff

Full systems testing, equipment calibration, staff training, regulatory compliance, and final QA inspection before go-live.

Typical timeline: 4–6 months. Larger multi-room facilities may take longer depending on scope. Parallel design and manufacturing accelerates deployment.

Ready to Explore Modular?

Contact our team to discuss your facility needs, timeline, and budget. We'll walk you through the design, build, and deployment process — and answer any questions about modular imaging solutions.

Phone: 888-588-2347 x800 | Email: sales@usamobilemedical.com